Germany: Why Energy Communities Are Not Yet Economically Viable
- Germany Still Lacks the Economic Incentive for Energy Communities
- For Municipal Utilities, Municipalities, and IPPs, a Simple PPA Is Usually the More Pragmatic Choice
- Early Preparation for Energy Communities Can Pay Off
Energy Communities are developing into a central building block of the European energy transition. As associations of citizens, municipalities, companies, or other local actors, they enable the collective generation, use, and marketing of locally produced energy. The legal foundation is provided by the EU directives RED II (Directive (EU) 2018/2001) and EMD (Directive (EU) 2019/944), which establish Energy Communities as an instrument for stronger integration of local actors into a decentralized energy system.
How strongly the potential of Energy Communities unfolds is determined primarily by national regulation. While countries such as Austria, Italy, and Greece actively promote Energy Communities, Germany still lacks the economic lever. Accordingly, the implementation of Energy Communities in Germany remains significantly behind the European frontrunners.
Figure 1. Overview of Energy Communities
Where Does the Idea Come From and How Should It Be Legally Implemented?
The energy transition is changing not only the origin of energy but increasingly also the organization of the entire energy system. Renewable electricity is being generated more and more decentrally in wind and photovoltaic installations. At the same time, interest is growing in using this electricity as locally as possible in order to reduce grid loads, increase regional value creation, and involve municipalities and citizens more strongly in the energy transition.
Energy Communities in Europe
In 2019, the European Union created a legal framework for Energy Communities for the first time with the “Clean Energy for all Europeans” package. This distinguishes between Renewable Energy Communities (REC) under the Renewable Energy Directive (RED II, Directive (EU) 2018/20011) and Citizen Energy Communities (CEC) under the Electricity Internal Market Directive (Directive (EU) 2019/9442).
While RECs remain limited to renewable energy, the CEC framework covers a broader field of activity and can include aggregation, energy efficiency services, or charging infrastructure, for example. Both models share the goal of supporting citizens, municipalities, and small and medium-sized enterprises in the collective generation and use of energy.
A further milestone was set by the reform of the European electricity market design in 2024: With the introduction of Art. 15a in the Electricity Internal Market Directive (Directive (EU) 2024/17113), households, small and medium-sized enterprises, and public institutions received the European right to joint energy use. The specific design, from spatial delimitation to possible grid fee reductions, is left to the member states.
The topic gains additional momentum through the advancing electrification of heating, mobility, and industry. With the Electrification Action Plan published in July 2026 (COM/2026/5954), the European Commission aims to increase the share of electricity in final energy consumption to around 46% by 2040 and sees local energy communities as a possible building block for efficiently using renewable electricity on site.

Figure 2. Regulatory Roadmap: Key Milestones at EU and National Level
Energy Communities in Germany
In Germany, too, the legal situation has fundamentally changed in recent months: With the EnWG amendment, which the Bundestag passed in autumn 2025 and which entered into force after the Bundesrat’s approval in December 2025, a dedicated legal framework for Energy Sharing5 was created for the first time with the new § 42c EnWG. Distribution system operators have been obliged since June 1, 2026, to technically enable the joint use of electricity from renewable energy installations in their grid area. Final consumers within the meaning of the provision include not only private households but also municipalities, other public institutions, and small and medium-sized enterprises.
Spatially, the model is initially narrowly defined: In the first phase (until May 2028), only participants within the same balancing area of a distribution system operator may share electricity. Only from June 2028 does the radius expand to neighboring balancing areas within the same control zone. Neither reduced grid fees nor exemptions from levies, electricity tax, or VAT are provided. Shared electricity is thus treated economically largely like regular grid supply.
With the publication of initial implementation guidance by the Federal Network Agency in July 2026 (Notice No. 736), it also became clear that Energy Sharing is to be fully integrated into existing energy market processes. A coordinating role for distribution system operators is not envisaged. Instead, suppliers or specialized service providers are to handle the energy market settlement. This interpretation is criticized by municipal utility associations and specialist institutes, among others, as it creates additional organizational requirements for energy communities and could hinder market ramp-up.
The legal framework in Germany is therefore in place, but practical implementation is still in an early phase. A comparison with other European countries shows how Energy Communities can develop under different regulatory conditions.
Five Countries Compared
The basic principle of Energy Community models in Europe is similar: electricity that is generated locally should also be consumed locally. However, the implementation of this principle differs from country to country.
| Country | Characteristics |
| Greece7 | Spatially Flexible Community Model:
Virtual net metering enables broad participation without direct installation site |
| Italy8 | Subsidy-Oriented Incentive Model:
Combination of feed-in premiums and funding programs creates investment security |
| Austria9 | Economically Privileged Sharing Model:
Grid fee advantages make collective electricity procurement measurably more attractive |
| Spain10 | Simplified Self-Supply Model:
Low administrative barriers accelerate adoption |
| Germany | Regulated but Economically Unattractive Model:
Legal possibility exists, but low financial differential compared to conventional electricity supply |
European experience shows that three key success factors emerge: spatial flexibility, economic attractiveness, and low administrative barriers.
Greece pursues an approach with virtual net metering that extends the participant base beyond the immediate location of a generation facility. Austria and Italy show that economic advantages can play a decisive role in market development. The development in Austria illustrates this connection particularly clearly. After the introduction of the Renewable Energy Expansion Act in 2021, significant momentum set in for the establishment of energy communities (Figure 3). Spain, in turn, shows that simplified procedures and clear framework conditions can also accelerate the spread of collective self-supply.
Figure 3. Development of Energy Communities in Austria, 2019–202511
Germany differs from these examples primarily in that Energy Sharing is legally enabled but so far generates hardly any economic advantages over conventional electricity supply. Germany also lags behind the Greek model in terms of spatial flexibility, as joint use is initially limited to a common balancing area.
Significance for Municipal Utilities, Municipalities, and IPPs
Against this background, the following applies: In Germany, the formal structure of an Energy Community is not yet worthwhile—a simple PPA is usually the more pragmatic choice. In countries with economic privileges such as Austria, Italy, Greece, or Spain, the situation is different: There, building an Energy Community can already pay off today.
For actors in Germany, this initially means not that Energy Communities play no role. Rather, the question arises of how municipal utilities, municipalities, and IPPs should deal with a model whose economic added value is still limited today but which could gain importance in the future. The roles of the three actor groups differ significantly.
Municipal Utilities: Prepare Energy Sharing Instead of Rolling Out Community Business
Municipal utilities fundamentally have the best prerequisites for handling Energy Sharing organizationally and in energy market terms: They have customer relationships, know local consumption structures, and already have processes for supply, metering, and billing.
Precisely for this reason, they do not necessarily have to build a formal Energy Community themselves today. It makes more sense to prepare their own role as future organizer and processor. Thanks to the clarification by the Federal Network Agency, electricity suppliers can already offer Energy Sharing today as an add-on to an existing residual electricity contract and handle non-shared surplus electricity via existing marketing channels.
The strategic advantage thus lies less in a short-term attractive community business case than in building know-how and infrastructure. Municipal utilities can gain experience with metering concepts, billing, and customer processes, thereby creating a starting position for the event that regulatory framework conditions improve in the future.
Municipalities: Use Local Demand Without Building Unnecessary Complexity
For municipalities, the situation is similar: They can play an important role as consumers of locally generated electricity but do not necessarily have to establish a formal Energy Community to do so.
Particularly obvious initially is the bundling of their own electricity consumption. Schools, town halls, swimming pools, or other municipal properties can serve as long-term consumers for local PV or wind installations. Where this results in an economically viable project, a PPA can be the simpler solution.
A formal community structure should only be chosen when it offers additional economic or strategic benefit over this simpler solution. For municipalities, this primarily means identifying suitable generation and consumption potentials early and keeping the option of later Energy Sharing open.
IPPs: Secure Projects via PPAs and Consider Energy Sharing
For Independent Power Producers (IPPs), the widespread development of formal Energy Communities is also not the priority today. Their central role lies rather in the development and financing of generation facilities.
Particularly in municipal projects, IPPs can help mobilize investments and build long-term offtake relationships. A PPA with a municipality or municipal utility can already create a comparatively simple foundation for this today.
Energy Sharing can be considered as a prospective extension. Projects can be developed, for example, in such a way that local consumers, participation models, or later Energy Sharing structures can in principle be integrated. The IPP does not have to become the organizer of a community itself but can combine its strengths—project development, financing, and scaling—with the local anchoring of municipalities and municipal utilities.
Why the PPA Is Usually the Better Solution Today
The decisive point is thus the relationship between economic benefit and additional complexity.
A formal Energy Community can bring together multiple local generators and consumers and thereby fundamentally enable stronger local use of renewable electricity. However, this requires additional organizational, metering, and billing processes. In Germany, this additional effort is currently only limitedly compensated by regulatory advantages. As a result, there is often insufficient added value compared to a conventional PPA.
The PPA therefore has a decisive advantage today: It achieves part of the same goal with significantly less organizational complexity. Generators and consumers can be connected long-term without initially building an additional community structure with corresponding governance and settlement processes.
Smart Meter Rollout: A Comparison
In addition to grid fee and subsidy policy, technical infrastructure also determines how quickly Energy Sharing can be implemented in practice. Above all, the smart meter rollout plays a crucial role, as quarter-hourly recording of generation and consumption forms the technical basis for any collective electricity use. Here, too, Germany falls significantly behind in international comparison: At the end of 2025, only 5.5% of all electricity meters were smart12. Italy and Spain, by contrast, have already almost completely digitized their meters (99.9% and 99%), Austria reaches a rollout rate of 98%. Greece, despite its progressive net metering model, lags similarly far behind Germany at around 12%—regulatory progress and infrastructural implementation do not necessarily go hand in hand. In Germany, the sluggish rollout means that metering and billing processes for Energy Sharing models will foreseeably remain dependent on transitional solutions for some time before nationwide, automated billing becomes possible.
Figure 4. Smart Meter Rollout in Europe13
Conclusion
Energy Communities connect three developments shaping the energy transition: the decentralization of generation, the political will for stronger electrification, and the growing economic pressure from declining market values for PV and wind power. The country comparison shows clearly: Economic privilege is the decisive growth driver. While in other countries Energy Communities are already economically feasible, in Germany a PPA often remains the more realistic choice.
This does not mean that Energy Communities play no role. The staggered entry into force of § 42c EnWG and the declining market values for renewable electricity create a window of time in which early preparation can pay off, even if the formal establishment of a community is not yet the right step in most cases today. However, for sustainable expansion, the following challenges must first be overcome:
- Lack of Privilege: Without tangible economic advantages over conventional electricity supply, the business case for Energy Communities remains thin.
- Technical and Infrastructural Gaps: Delayed smart meter rollout, missing market processes at grid operators, and limited grid connection capacity slow implementation.
- Declining Revenues from Direct Marketing: The cannibalization effect devalues PV electricity precisely at generation peaks and makes conventional, spot market-based PPAs increasingly unattractive.
- Lack of Operational Carriers: Actors are needed who actually handle contract management, balancing, and billing—a role that is neither clearly assigned nor economically secured in many places.
From the newsletter
“REInEws” Your partner for RE and transformation:
We are happy to advise you.
Sources:
1 Directive – 2018/2001 – EN – RED II – EUR-Lex
2 Directive – 2019/944 – EN – EUR-Lex
3 Directive – EU – 2024/1711 – EN – EUR-Lex
4 EUR-Lex – 52026DC0595 – EN – EUR-Lex
5 § 42c EnWG – Individual Provision
6 Federal Network Agency – Decision Chambers – Notice No. 73 on Implementation of the GPKE Decision
7 202310_TheGreenTank_Brief_EnergyCommunities4_EN.pdf
8 SIEV 35 INGLESE
9 2021_07_27_Erneuerbaren-Ausbau-Gesetzespaket.pdf
10 EECF country fiche Spain.pdf
11 Annual Report on Renewable Electricity Development and Combined Heat and Power – E-Control
12 Federal Network Agency – Homepage – Rollout of Smart Metering Systems
13 Retail energy markets – 2026 Monitoring Report | www.acer.europa.eu